PUBLIC HEARING OF THE
BOARD OF WATER, ELECTRIC,
AND COMMUNICATIONS TRUSTEES
OF THE CITY OF MUSCATINE, IOWA
JANUARY 28, 2014-5:28 P.M.
The Board of Trustees conducted a public hearing in Muscatine Power and Water's
Administration/Operations Building, 3205
Cedar Street, Muscatine, Iowa, on Tuesday, January
28, 2014, at 5:28p.m.
Chairperson Doyle Tubandt called the meeting to order. Members of the Board were present as
follows: Trustees Doyle Tubandt, Tracy McGinnis, Warren Heidbreder, Steven Bradford, and
Joan Axel.
Also present were Sal LoBianco, General Manager of Muscatine Power and Water; Jerry Gowey,
Board Secretary;
Charles Potter, Muscatine Journal; Erika Cox, Brandy Olson, Tim Reed, Gage
Huston, and Brenda Christensen of Muscatine Power and Water.
The purpose of the public hearing was to receive any citizens' comments regarding the
Construct Well 44 at Main Well Field and Construct Well 45 at Progress Park Well Field Projects.
Mr. Gowey, Board Secretary, opened the public hearing at 5:28 p.m. to receive any citizens'
comments regarding the
Construct Well 44 at Main Well Field and Construct Well 45 at
Progress Park Well Field Projects.
Mr. Gowey stated that no written or oral comments were received regarding these projects,
and that the public hearing notice was published as required by the Code of Iowa.
A resolution passed approving the final plans and specifications of the project.
RESOLUTION 14-01
WHEREAS, the Board of Water, Electric, and Communications Trustees of the
City of Muscatine, Iowa has given tentative approval to plans and specifications
for the Construct Well 44 at Main Well Field and Construct Well 45 at Progress
Park Well Field Projects; and,
WHEREAS, bids have been received and there are no written or oral objections
to proceeding with these projects; now therefore,
BE IT RESOLVED, by the Board of Water, Electric, and Communications Trustees
of the City of Muscatine, Iowa, that the plans and specifications for the Construct
Well
44 at Main Well Field and Construct Well 45 at Progress Park Well Field
Projects be adopted.
ITEM 12C
Trustee Bradford moved, seconded by Trustee McGinnis, that the said resolution should be
passed, approved, and adopted
this
28th
day of January
2014.
On roll call Trustees Axel,
Heidbreder, Bradford, McGinnis, and Tubandt voted aye. Voting nay, none. Resolution carried.
At 5:30
the Secretary closed the public hearing for the Construct Well
44
at Main Well Field and
Construct Well 45 at Progress Park Well Field Projects.
BOARD OF WATER, ELECTRIC, AND
COMMUNICATIONS TRUSTEES OF
CITY OF MUSCATINE, IOWA
erry Gowey
Board Secretary
OFFICIAL PROCEEDINGS OF THE
BOARD OF WATER, ELECTRIC,
AND COMMUNICATIONS TRUSTEES
OF THE CITY OF MUSCATINE, IOWA
JANUARY 28,2014-5:30 P.M.
The Board of Trustees met in regular session at Muscatine Power and Water's
Administration/Operations Building,
3205 Cedar Street, Muscatine, Iowa, on Tuesday,
January
28, 2014, at 5:30 p.m.
Chairperson Doyle Tubandt
called the meeting to order. Members of the Board were present
as follows: Trustees Doyle Tubandt, Tracy McGinnis, Warren Heidbreder, Steven Bradford,
and
Joan Axel.
Also present were Sal LoBianco, General Manager of Muscatine Power and Water; Jerry
Gowey, Board Secretary;
Charles Potter, Muscatine Journal; Erika Cox, Brandy Olson, Tim
Reed, Gage Huston, and Brenda Christensen of Muscatine Power and Water.
Chairperson Tubandt
asked if there was anyone in attendance who wished to make any
.
public comments. There were no public comments.
The minutes of the December 19, 2013, regular meeting, and the December 19, 2013,
Audit/Finance Committee Meeting minutes were presented as previously submitted to all
Board members in written form. Trustee Axel moved, seconded by Trustee McGinnis, that
the minutes be approved as submitted. All Trustees voted aye. Motion carried. The
Audit/Finance Committee Meeting minutes were received and placed on file.
The list of expenditures and transactions for December 2013 was presented as previously
submitted
to all Board members in written form. After review and discussion of the
expenditures, Trustee Heidbreder moved, seconded by Trustee Axel,
to ratify payment of
$6,395,146.32 for the Electric Utility, $394,658.91 for the Water Utility, and $856,296.55 for
the Communications Utility for a cumulative total of $7,646,101.78. All Trustees voted aye.
Motion carried.
Mr. LoBianco reviewed the previously submitted memorandum
to all Board members
regarding the receipt and evaluation
of bids for the two projects, Construct Well 44 at Main
Well Field and Construct Well 45 at Progress Park Well Field; revised project summary forms
for these projects were approved at the December 2013 Board meeting. Specifications
pertaining
to the projects were mailed to seventeen (17) potential bidders. A total of three
(3) bids were received, opened publicly, and read aloud on January 14, 2014, with all three
(3) bidders at the opening. The total approved expenditure for these two projects is
$935,769; with a published estimate of $629,982. The bids were reviewed and conformance
of the low bidder to the specifications was established. MP&W Management recommended
that the
low bidder, Northway Well and Pump Company of Marion, Iowa, be awarded the
contract
for the Construct Well 44 at Main Well Field and Construct Well 45 at Progress Park
Well Field Projects
for the total contract price of $593,223.45. The total price of this bid
includes a $3,400 increase to the base bid for the optional 6" steel casing and screens on
Board Minutes
January 28, 2014
Page 2 of8
both test wells and a $1,800 deduction for award of both wells to the same contractor. The
contract also includes bonus payments for early completion which are capped at 10% of the
contract liquidated damages
for late completion of any well. Mr. LoBianco communicated
that MP&W Management had met with both of the Utility's largest water customers
regarding water usage needs
for the summer, and it was determined that to meet the
projected summer demand the
wells were needed to meet immediate demand. After review
of the project, the following resolution was submitted:
RESOLUTION 14-02
WHEREAS, it appears in a written report from Muscatine Power and Water
Management
that the bid for the Construct Well 44 at Main Well Field and Construct
Well 45 at Progress Park Well Field Projects, as submitted by Northway Well and
Pump Company of Marion, Iowa, in the amount of $593,223.45, was the best and
lowest bid received; now therefore,
BE IT RESOLVED by the Board of Water, Electric, and Communications Trustees of
the City of Muscatine, Iowa, that the proposal from Northway Well and Pump
Company
of Marion, Iowa, in the amount of $593,223.45 for the Construct Well 44
at Main
Well Field and Construct Well 45 at Progress Park Well Field Projects were
hereby accepted
as submitted; and,
BE IT FURTHER RESOLVED, that the General Manager and Secretary of the Board
were hereby authorized, empowered,
and directed to execute a contract in the sum
approved by the Board
of Water, Electric, and Communications Trustees.
Trustee Heidbreder moved, seconded by Trustee
Axel, that the resolution should be
passed, approved, and adopted this 28th day of January 2014. On roll call Trustees
McGinnis, Bradford,
Axel, Heidbreder, and Tubandt voted aye. Voting nay, none.
Resolution carried.
Mr. LoBianco introduced the next item
on the agenda as approval of Unit 8A Reboilers Tube
Replacement Project
with an expected expenditure of $1,250,000. This project involves the
complete replacement of all tubes in the two (2) Reboilers at the Generation Site. Over the
last 12 months, MP&W has been experiencing operational issues with the Reboiler system.
Fouling of the exterior side of the tubes was suspected due to instances of poor water
quality coming back from GPC's process. As described in the project justification included
with the memo, an investigation into the issue led to the discovery that the exterior side of
the Reboiler tubes (i.e. the GPC side) has a significant amount of scaling due to poor water
quality. This scaling has decreased the operating efficiency of the Reboiler system and led to
pitting of the tubes, which ultimately leads to tube failure. The expenditure associated with
this project
is subject to cost sharing with Grain Processing Corporation (GPC) per the first
amendment
to the Steam Sales Contract between MP&W and GPC. The costs associated
with the project will be allocated 80% to GPC and 20% to MP&W. This allocation is a variance
from
that which was prescribed in Section 8.08 of the First Amendment, however, both
Parties have
mutually agreed that operating conditions have varied from what was
prescribed in the Contract and thus warranted a change in the contractually specified cost
Board Minutes
January 28, 2014
Page 3 of8
allocation. GPC's portion of the project cost will be amortized with interest over the
remaining
term of the existing contract and recovered through the ongoing per-unit cost of
steam during that term. At the agreed to cost allocation, the estimated cost impact to
MP&W is $250,000. After review and discussion, Trustee Axel moved, seconded by Trustee
McGinnis,
to approve the Unit 8A Reboilers Tube Replacement Project. All Trustees voted
aye. Motion carried.
Mr. LoBianco reviewed
the previously submitted memorandum regarding the request for
approval for an amendment to the 2013 Borrowing Arrangement between the Water Utility
and the Electric
Utility. In 2013 the Water Utility entered into a $4.5 million Line of Credit
(LOC) with the Electric Utility at an interest rate of 0.10%. Currently the amount advanced
from the Electric Utility
to the Water Utility totals $400,000. The LOC keeps borrowing costs
to a minimum, until financing needs are better defined and long-term financing can be
arranged, and contributes
to Utility liquidity requirements. The interest rate on this LOC may
be adjusted by the Board each January to reflect the Electric Utility's investment opportunity
cost.
Currently, the Electric Utility is earning an average rate of return of 0.18% on all cash,
money market and invested funds. At the December 2013 Audit/Finance Committee
meeting, Management recommended an increase of the interest rate from 0.10% to 0.18%
on the short-term borrowing arrangement between the Water and Electric Utility to be
effective January
1, 2014. The Audit/Finance Committee concurred with this approach and
recommended going
to the full Board for approval.
RESOLUTION 14-03
Amend the Borrowing Agreement between the
Water Utility and the Electric Utility
WHEREAS, the City of Muscatine, Iowa, acting by and through its Board of Water,
Electric, and Communications Trustees (the
"Board") approved an Advance
borrowing arrangement between the Water Utility and the Electric
Utility on
January 29, 2013; and
WHEREAS, the interest rate on the Advance may be adjusted January 1, 2014 and
annually thereafter, to reflect the Electric Utility's investment opportunity cost; and
WHEREAS, the Board reviewed the Electric Utility's investment opportunity costs
and determined
an amendment to the interest rate on the Advance is warranted
NOW, THEREFORE, it is hereby resolved by the Board that the Advance is amended, as
follows:
1. It is directed that the interest rate on the Advance is adjusted from 0.10%
to 0.18% effective January 1, 2014, to reflect the Electric Utility's
investment
opportunity cost.
2. All other terms of the Advance remain as originally stated.
The undersigned hereby certifies that the foregoing is a full, true, and correct
copy
of the declaration of the Board duly made at a meeting on January 28,
2014, and
that said declaration has not been amended, modified, or revoked by
Board Minutes
January
28
,
2014
Page 4 of8
said Board of Water, Electric and Communications Trustees.
Trustee Bradford moved, seconded by Trustee McGinnis,
that the resolution should be
passed, approved, and adopted this
28th
day of January
2014.
On roll call Trustees
McGinnis, Bradford,
Axel, Heidbreder, and Tubandt voted aye. Voting nay, none.
Resolution carried.
Mr. LoBianco introduced
the next item on the agenda as approval of Reimbursement
Resolutions
for all three Utilities, as recommended by Bond Counsel on an annual basis. The
Ten-Year Electric and Water Financial
Projections indicate substantial capital expenditures
which may require various borrowing needs
in
2014
and beyond. The borrowings may be a
combination
of tax-exempt and taxable debt, depending on how the proceeds are to be
used.
The recommended resolutions are similar to what the Board has adopted in past years and
state
that the Board reasonably expects to reimburse itself or pay for capital
expenditures from the proceeds of a future debt issue. The Board may then issue tax-
exempt
debt for capital projects paid within 60 days prior to passage of the resolution or
paid after passage of the resolution. Reimbursement must be completed within
18
months
of (a) the original expenditure; or (b) the date the project is in service, but in no event
more than three
{3) years after the original expenditure is paid. The Reimbursement
Resolutions do
not obligate the Board to include all qualifying capital projects in the debt
issues, but it does give the Board the ability to include them if they otherwise qualify
and the economics warrant.
After discussion and review, the following resolutions were submitted.
RESOLUTION 14-04
Declaration of official intent of the City of Muscatine, Iowa, acting by
and through its Board of Water, Electric, and Communications Trustees
of the City of Muscatine, Iowa, to reimburse certain expenditures
from proceeds
ofindebtedness for the Electric Utility
WHEREAS, the City of Muscatine, Iowa, (the "Issuer") acting by and through its
Board
of Water, Electric, and Communications Trustees (the
"Board")
intends to
acquire land, construct, improve, furnish, and equip extensions, improvements, and
other capital projects related to the MP&W Electric Utility (collectively the
"Projects"); and
WHEREAS, the Issuer expects to pay certain expenditures (the "Reimbursement
Expenditures") in connection with the
Projects prior to the issuance of indebtedness
for the purpose of financing costs associated with the Projects on a long-term basis;
and
WHEREAS, the Issuer reasonably expects that debt obligations in an amount not
expected to exceed
$21,000,000
will be issued with respect to financing of the
Projects and that certain of the proceeds of such debt obligations will be used to
reimburse the Reimbursement Expenditures; and
Board Minutes
January 28, 2014
Page
5
of8
WHEREAS, the Issuer desires to comply with the requirements of Treasury
Regulation
1.150-2 (the "Regulations") with respect to the Projects;
NOW THEREFORE, it is hereby resolved by the Board of Water, Electric, and
Communications Trustees of the City of Muscatine, Iowa, as follows:
Section
1.
The Issuer finds and determines that the foregoing recitals are
true and correct.
Section 2.
This declaration is made solely for the purpose of establishing
compliance with the requirements
of Section 1.150-2 of the
Treasury Regulations. This
declaration does not bind the Issue to
make any expenditure, incur any indebtedness, or proceed with
the Projects.
Section 3.
The Issuer hereby declares itself its official intent to use
proceeds
of
indebtedness
to
reimburse
itself
for
Reimbursements Expenditures with respect to the Projects.
Section 4.
This declaration shall take effect from and after its adoption.
Trustee Heidbreder moved, seconded by Trustee Bradford,
that the resolution should be
passed, approved, and adopted this 28th day of January
2Cl14.
On roll call Trustees
McGinnis, Bradford, Axel, Heidbreder, and Tubandt voted
aye. Voting nay, none.
Resolution carried.
RESOLUTION 14-05
Declaration of official intent of the City of Muscatine, Iowa, acting by
and through its Board of Water, Electric, and Communications Trustees
of the City of Muscatine, Iowa, to reimburse certain expenditures
from proceeds
ofindebtedness for the Water Utility
WHEREAS, the City of Muscatine, Iowa, (the "Issuer") acting by and through its
Board
of Water, Electric, and Communications Trustees (the "Board") intends to
acquire land, construct, improve, furnish, and equip extensions, improvements, and
other capital projects related to the MP&W Water Utility (collectively the
"Projects"); and
WHEREAS, the Issuer expects to pay certain expenditures (the "Reimbursement
Expenditures")
in connection with the Projects prior to the issuance of indebtedness
for the purpose of financing costs associated with the Projects on a long-term basis;
and
WHEREAS, the Issuer reasonably expects that debt obligations in an amount not
expected
to exceed $11,000,000 will be issued with respect to financing of the
Projects and
that certain of the proceeds of such debt obligations will be used to
reimburse the Reimbursement Expenditures; and
WHEREAS, the Issuer desires to comply with the requirements of Treasury
Regulation
1.150-2 (the "Regulations") with respect to the Projects;
Board Minutes
January
28, 2014
Page 6
of8
NOW THEREFORE, it is hereby resolved by the Board of Water, Electric, and
Communications Trustees of the City of Muscatine, Iowa, as follows:
Section 1.
The Issuer finds and determines that the foregoing recitals are
true and correct.
Section
2.
This declaration
is
made solely for the purpose of establishing
compliance
with the requirements of Section
1.150-2
of the
Treasury
Regulations. This declaration does not bind the Issue to
make any expenditure, incur any indebtedness, or proceed with
the Projects.
Section
3.
The Issuer hereby declares itself its official intent to use
proceeds
of
indebtedness
to
reimburse
itself
for
Reimbursements Expenditures with respect to the Projects.
Section
4.
This declaration shall take effect f-rom and after its adoption.
Trustee
Axel moved, seconded by Trustee McGinnis, that the resolution should be
passed, approved, and adopted this
28th
day of January
2014.
On roll call Trustees
McGinnis, Bradford,
Axel, Heidbreder, and Tubandt voted aye. Voting nay, none.
Resolution carried.
RESOLUTION 14-06
Declaration ofofficial intent of the City of Muscatine, Iowa, acting by
and through its Board of Water, Electric, and Communications Trustees
of the City of Muscatine, Iowa, to reimburse certain expenditures
from proceeds
ofindebtedness for the Communications Utility
WHEREAS, the City of Muscatine, Iowa, (the
"Issuer")
acting by and through its
Board
of Water, Electric, and Communications Trustees (the
"Board") intends
to
acquire
land, construct, improve, furnish, and equip extensions, improvements, and
other capital projects related to the MP&W Communications Utility (collectively the
"Projects");
and
WHEREAS, the Issuer expects to pay certain expenditures (the "Reimbursement
Expenditures") in connection with the
Projects prior to the issuance of indebtedness
for the purpose of financing costs associated with the Projects on a long-term basis;
and
WHEREAS, the Issuer reasonably expects that debt obligations in an amount not
expected
to exceed
$5,000,000
will be issued with respect to financing of the
Projects and that certain of the proceeds of such debt obligations will be used to
reimburse the Reimbursement Expenditures; and
WHEREAS, the Issuer desires to comply with the requirements of Treasury
Regulation
1.150-2
(the "Regulations") with respect to the Projects;
Board Minutes
January 28, 2014
Page 7 of8
NOW THEREFORE, it is hereby resolved by the Board of Water, Electric, and
Communications Trustees
of the City of Muscatine, Iowa, as follows:
Section
1.
The Issuer finds and determines that the foregoing recitals are true
and correct.
Section
2.
This declaration is made solely for the purpose of establishing
compliance
with the requirements of Section
1.150-2
of the
Treasury Regulations. This declaration does
not bind the Issue to
make any expenditure, incur any indebtedness, or proceed with the
Projects.
Section 3.
The Issuer hereby declares itself its official intent to use proceeds
of indebtedness to reimburse itself for Reimbursements
Expenditures
with respect to the Projects.
Section 4.
This declaration shall take effect from and after its adoption.
Trustee Heidbreder moved, seconded by Trustee Bradford,
that the resolution should be
passed, approved, and adopted this
28th
day of January
2014.
On roll call Trustees
McGinnis, Bradford, Axel, Heidbreder,
and Tubandt voted aye. Voting nay, none.
Resolution carried.
The December Financial Operating Statements and Balance Sheets and the Quarterly
Investment Report were presented as previously submitted to all Board members in written
form. Mr. LoBianco stated that
2013
Year-End Financials would be covered in the Key
Performance Indicators presentation. Trustee Axel moved, seconded by Trustee McGinnis, to
receive and place on file the December Financial Operating Statements and Balance Sheets
for the Water, Electric, and Communications Utilities, along with the Quarterly Investment
Report. All Trustees voted aye. Motion carried.
The Competitive Quotes for Public Improvements Report was presented as previously
submitted
to all Board members in written form. There were no items for approval.
The Quarterly Project Status Report and Variance Analysis were presented as previously
submitted
to all Board members in written form. Trustee McGinnis moved, seconded by
Trustee Bradford,
to receive and place on file the Quarterly Project Status Report and
Variance Analysis. All Trustees voted aye. Motion carried.
The Critical Issues and Key Performance Indicators for the Water, Electric, and Communi-
cations Utilities were previously submitted to
all Board members in written format. Mr.
LoBianco
asked each critical issue leader to review the status of their critical issue and stated
that Mr. Gowey would review the Key Performance Indicators sections. After review and
discussion, Trustee McGinnis moved, seconded by Trustee Axel, to receive and place c_>n file
the
2013
Year End Critical Issues and Key Performance Indicators for the Water, Electric, and
Communications Utilities.
Motion carried. All Trustees voted aye.
The December departmental reports were presented as previously submitted to all Board
members
in written form. After discussion, Trustee Heidbreder moved, seconded by Trustee
Board Minutes
January 28,
2014
Page 8of8
Axel, to receive and place on file the December departmental reports. All Trustees voted
aye. Motion carried.
The meeting was adjourned at 7:10 p.m.
BOARD OF WATER, ELECTRIC, AND
COMMUNICATIONS TRUSTEES OF THE CITY
OF MUSCATINE, IOWA
ca:t,
Board Secretary
Back to top