PUBLIC HEARING OF THE
    BOARD OF WATER, ELECTRIC,
    AND COMMUNICATIONS TRUSTEES
    OF THE CITY OF MUSCATINE, IOWA
    JANUARY 28, 2014-5:28 P.M.
    The Board of Trustees conducted a public hearing in Muscatine Power and Water's
    Administration/Operations Building, 3205
    Cedar Street, Muscatine, Iowa, on Tuesday, January
    28, 2014, at 5:28p.m.
    Chairperson Doyle Tubandt called the meeting to order. Members of the Board were present as
    follows: Trustees Doyle Tubandt, Tracy McGinnis, Warren Heidbreder, Steven Bradford, and
    Joan Axel.
    Also present were Sal LoBianco, General Manager of Muscatine Power and Water; Jerry Gowey,
    Board Secretary;
    Charles Potter, Muscatine Journal; Erika Cox, Brandy Olson, Tim Reed, Gage
    Huston, and Brenda Christensen of Muscatine Power and Water.
    The purpose of the public hearing was to receive any citizens' comments regarding the
    Construct Well 44 at Main Well Field and Construct Well 45 at Progress Park Well Field Projects.
    Mr. Gowey, Board Secretary, opened the public hearing at 5:28 p.m. to receive any citizens'
    comments regarding the
    Construct Well 44 at Main Well Field and Construct Well 45 at
    Progress Park Well Field Projects.
    Mr. Gowey stated that no written or oral comments were received regarding these projects,
    and that the public hearing notice was published as required by the Code of Iowa.
    A resolution passed approving the final plans and specifications of the project.
    RESOLUTION 14-01
    WHEREAS, the Board of Water, Electric, and Communications Trustees of the
    City of Muscatine, Iowa has given tentative approval to plans and specifications
    for the Construct Well 44 at Main Well Field and Construct Well 45 at Progress
    Park Well Field Projects; and,
    WHEREAS, bids have been received and there are no written or oral objections
    to proceeding with these projects; now therefore,
    BE IT RESOLVED, by the Board of Water, Electric, and Communications Trustees
    of the City of Muscatine, Iowa, that the plans and specifications for the Construct
    Well
    44 at Main Well Field and Construct Well 45 at Progress Park Well Field
    Projects be adopted.
    ITEM 12C

    Trustee Bradford moved, seconded by Trustee McGinnis, that the said resolution should be
    passed, approved, and adopted
    this
    28th
    day of January
    2014.
    On roll call Trustees Axel,
    Heidbreder, Bradford, McGinnis, and Tubandt voted aye. Voting nay, none. Resolution carried.
    At 5:30
    the Secretary closed the public hearing for the Construct Well
    44
    at Main Well Field and
    Construct Well 45 at Progress Park Well Field Projects.
    BOARD OF WATER, ELECTRIC, AND
    COMMUNICATIONS TRUSTEES OF
    CITY OF MUSCATINE, IOWA
    erry Gowey
    Board Secretary

    OFFICIAL PROCEEDINGS OF THE
    BOARD OF WATER, ELECTRIC,
    AND COMMUNICATIONS TRUSTEES
    OF THE CITY OF MUSCATINE, IOWA
    JANUARY 28,2014-5:30 P.M.
    The Board of Trustees met in regular session at Muscatine Power and Water's
    Administration/Operations Building,
    3205 Cedar Street, Muscatine, Iowa, on Tuesday,
    January
    28, 2014, at 5:30 p.m.
    Chairperson Doyle Tubandt
    called the meeting to order. Members of the Board were present
    as follows: Trustees Doyle Tubandt, Tracy McGinnis, Warren Heidbreder, Steven Bradford,
    and
    Joan Axel.
    Also present were Sal LoBianco, General Manager of Muscatine Power and Water; Jerry
    Gowey, Board Secretary;
    Charles Potter, Muscatine Journal; Erika Cox, Brandy Olson, Tim
    Reed, Gage Huston, and Brenda Christensen of Muscatine Power and Water.
    Chairperson Tubandt
    asked if there was anyone in attendance who wished to make any
    .
    public comments. There were no public comments.
    The minutes of the December 19, 2013, regular meeting, and the December 19, 2013,
    Audit/Finance Committee Meeting minutes were presented as previously submitted to all
    Board members in written form. Trustee Axel moved, seconded by Trustee McGinnis, that
    the minutes be approved as submitted. All Trustees voted aye. Motion carried. The
    Audit/Finance Committee Meeting minutes were received and placed on file.
    The list of expenditures and transactions for December 2013 was presented as previously
    submitted
    to all Board members in written form. After review and discussion of the
    expenditures, Trustee Heidbreder moved, seconded by Trustee Axel,
    to ratify payment of
    $6,395,146.32 for the Electric Utility, $394,658.91 for the Water Utility, and $856,296.55 for
    the Communications Utility for a cumulative total of $7,646,101.78. All Trustees voted aye.
    Motion carried.
    Mr. LoBianco reviewed the previously submitted memorandum
    to all Board members
    regarding the receipt and evaluation
    of bids for the two projects, Construct Well 44 at Main
    Well Field and Construct Well 45 at Progress Park Well Field; revised project summary forms
    for these projects were approved at the December 2013 Board meeting. Specifications
    pertaining
    to the projects were mailed to seventeen (17) potential bidders. A total of three
    (3) bids were received, opened publicly, and read aloud on January 14, 2014, with all three
    (3) bidders at the opening. The total approved expenditure for these two projects is
    $935,769; with a published estimate of $629,982. The bids were reviewed and conformance
    of the low bidder to the specifications was established. MP&W Management recommended
    that the
    low bidder, Northway Well and Pump Company of Marion, Iowa, be awarded the
    contract
    for the Construct Well 44 at Main Well Field and Construct Well 45 at Progress Park
    Well Field Projects
    for the total contract price of $593,223.45. The total price of this bid
    includes a $3,400 increase to the base bid for the optional 6" steel casing and screens on

    Board Minutes
    January 28, 2014
    Page 2 of8
    both test wells and a $1,800 deduction for award of both wells to the same contractor. The
    contract also includes bonus payments for early completion which are capped at 10% of the
    contract liquidated damages
    for late completion of any well. Mr. LoBianco communicated
    that MP&W Management had met with both of the Utility's largest water customers
    regarding water usage needs
    for the summer, and it was determined that to meet the
    projected summer demand the
    wells were needed to meet immediate demand. After review
    of the project, the following resolution was submitted:
    RESOLUTION 14-02
    WHEREAS, it appears in a written report from Muscatine Power and Water
    Management
    that the bid for the Construct Well 44 at Main Well Field and Construct
    Well 45 at Progress Park Well Field Projects, as submitted by Northway Well and
    Pump Company of Marion, Iowa, in the amount of $593,223.45, was the best and
    lowest bid received; now therefore,
    BE IT RESOLVED by the Board of Water, Electric, and Communications Trustees of
    the City of Muscatine, Iowa, that the proposal from Northway Well and Pump
    Company
    of Marion, Iowa, in the amount of $593,223.45 for the Construct Well 44
    at Main
    Well Field and Construct Well 45 at Progress Park Well Field Projects were
    hereby accepted
    as submitted; and,
    BE IT FURTHER RESOLVED, that the General Manager and Secretary of the Board
    were hereby authorized, empowered,
    and directed to execute a contract in the sum
    approved by the Board
    of Water, Electric, and Communications Trustees.
    Trustee Heidbreder moved, seconded by Trustee
    Axel, that the resolution should be
    passed, approved, and adopted this 28th day of January 2014. On roll call Trustees
    McGinnis, Bradford,
    Axel, Heidbreder, and Tubandt voted aye. Voting nay, none.
    Resolution carried.
    Mr. LoBianco introduced the next item
    on the agenda as approval of Unit 8A Reboilers Tube
    Replacement Project
    with an expected expenditure of $1,250,000. This project involves the
    complete replacement of all tubes in the two (2) Reboilers at the Generation Site. Over the
    last 12 months, MP&W has been experiencing operational issues with the Reboiler system.
    Fouling of the exterior side of the tubes was suspected due to instances of poor water
    quality coming back from GPC's process. As described in the project justification included
    with the memo, an investigation into the issue led to the discovery that the exterior side of
    the Reboiler tubes (i.e. the GPC side) has a significant amount of scaling due to poor water
    quality. This scaling has decreased the operating efficiency of the Reboiler system and led to
    pitting of the tubes, which ultimately leads to tube failure. The expenditure associated with
    this project
    is subject to cost sharing with Grain Processing Corporation (GPC) per the first
    amendment
    to the Steam Sales Contract between MP&W and GPC. The costs associated
    with the project will be allocated 80% to GPC and 20% to MP&W. This allocation is a variance
    from
    that which was prescribed in Section 8.08 of the First Amendment, however, both
    Parties have
    mutually agreed that operating conditions have varied from what was
    prescribed in the Contract and thus warranted a change in the contractually specified cost

    Board Minutes
    January 28, 2014
    Page 3 of8
    allocation. GPC's portion of the project cost will be amortized with interest over the
    remaining
    term of the existing contract and recovered through the ongoing per-unit cost of
    steam during that term. At the agreed to cost allocation, the estimated cost impact to
    MP&W is $250,000. After review and discussion, Trustee Axel moved, seconded by Trustee
    McGinnis,
    to approve the Unit 8A Reboilers Tube Replacement Project. All Trustees voted
    aye. Motion carried.
    Mr. LoBianco reviewed
    the previously submitted memorandum regarding the request for
    approval for an amendment to the 2013 Borrowing Arrangement between the Water Utility
    and the Electric
    Utility. In 2013 the Water Utility entered into a $4.5 million Line of Credit
    (LOC) with the Electric Utility at an interest rate of 0.10%. Currently the amount advanced
    from the Electric Utility
    to the Water Utility totals $400,000. The LOC keeps borrowing costs
    to a minimum, until financing needs are better defined and long-term financing can be
    arranged, and contributes
    to Utility liquidity requirements. The interest rate on this LOC may
    be adjusted by the Board each January to reflect the Electric Utility's investment opportunity
    cost.
    Currently, the Electric Utility is earning an average rate of return of 0.18% on all cash,
    money market and invested funds. At the December 2013 Audit/Finance Committee
    meeting, Management recommended an increase of the interest rate from 0.10% to 0.18%
    on the short-term borrowing arrangement between the Water and Electric Utility to be
    effective January
    1, 2014. The Audit/Finance Committee concurred with this approach and
    recommended going
    to the full Board for approval.
    RESOLUTION 14-03
    Amend the Borrowing Agreement between the
    Water Utility and the Electric Utility
    WHEREAS, the City of Muscatine, Iowa, acting by and through its Board of Water,
    Electric, and Communications Trustees (the
    "Board") approved an Advance
    borrowing arrangement between the Water Utility and the Electric
    Utility on
    January 29, 2013; and
    WHEREAS, the interest rate on the Advance may be adjusted January 1, 2014 and
    annually thereafter, to reflect the Electric Utility's investment opportunity cost; and
    WHEREAS, the Board reviewed the Electric Utility's investment opportunity costs
    and determined
    an amendment to the interest rate on the Advance is warranted
    NOW, THEREFORE, it is hereby resolved by the Board that the Advance is amended, as
    follows:
    1. It is directed that the interest rate on the Advance is adjusted from 0.10%
    to 0.18% effective January 1, 2014, to reflect the Electric Utility's
    investment
    opportunity cost.
    2. All other terms of the Advance remain as originally stated.
    The undersigned hereby certifies that the foregoing is a full, true, and correct
    copy
    of the declaration of the Board duly made at a meeting on January 28,
    2014, and
    that said declaration has not been amended, modified, or revoked by

    Board Minutes
    January
    28
    ,
    2014
    Page 4 of8
    said Board of Water, Electric and Communications Trustees.
    Trustee Bradford moved, seconded by Trustee McGinnis,
    that the resolution should be
    passed, approved, and adopted this
    28th
    day of January
    2014.
    On roll call Trustees
    McGinnis, Bradford,
    Axel, Heidbreder, and Tubandt voted aye. Voting nay, none.
    Resolution carried.
    Mr. LoBianco introduced
    the next item on the agenda as approval of Reimbursement
    Resolutions
    for all three Utilities, as recommended by Bond Counsel on an annual basis. The
    Ten-Year Electric and Water Financial
    Projections indicate substantial capital expenditures
    which may require various borrowing needs
    in
    2014
    and beyond. The borrowings may be a
    combination
    of tax-exempt and taxable debt, depending on how the proceeds are to be
    used.
    The recommended resolutions are similar to what the Board has adopted in past years and
    state
    that the Board reasonably expects to reimburse itself or pay for capital
    expenditures from the proceeds of a future debt issue. The Board may then issue tax-
    exempt
    debt for capital projects paid within 60 days prior to passage of the resolution or
    paid after passage of the resolution. Reimbursement must be completed within
    18
    months
    of (a) the original expenditure; or (b) the date the project is in service, but in no event
    more than three
    {3) years after the original expenditure is paid. The Reimbursement
    Resolutions do
    not obligate the Board to include all qualifying capital projects in the debt
    issues, but it does give the Board the ability to include them if they otherwise qualify
    and the economics warrant.
    After discussion and review, the following resolutions were submitted.
    RESOLUTION 14-04
    Declaration of official intent of the City of Muscatine, Iowa, acting by
    and through its Board of Water, Electric, and Communications Trustees
    of the City of Muscatine, Iowa, to reimburse certain expenditures
    from proceeds
    ofindebtedness for the Electric Utility
    WHEREAS, the City of Muscatine, Iowa, (the "Issuer") acting by and through its
    Board
    of Water, Electric, and Communications Trustees (the
    "Board")
    intends to
    acquire land, construct, improve, furnish, and equip extensions, improvements, and
    other capital projects related to the MP&W Electric Utility (collectively the
    "Projects"); and
    WHEREAS, the Issuer expects to pay certain expenditures (the "Reimbursement
    Expenditures") in connection with the
    Projects prior to the issuance of indebtedness
    for the purpose of financing costs associated with the Projects on a long-term basis;
    and
    WHEREAS, the Issuer reasonably expects that debt obligations in an amount not
    expected to exceed
    $21,000,000
    will be issued with respect to financing of the
    Projects and that certain of the proceeds of such debt obligations will be used to
    reimburse the Reimbursement Expenditures; and

    Board Minutes
    January 28, 2014
    Page
    5
    of8
    WHEREAS, the Issuer desires to comply with the requirements of Treasury
    Regulation
    1.150-2 (the "Regulations") with respect to the Projects;
    NOW THEREFORE, it is hereby resolved by the Board of Water, Electric, and
    Communications Trustees of the City of Muscatine, Iowa, as follows:
    Section
    1.
    The Issuer finds and determines that the foregoing recitals are
    true and correct.
    Section 2.
    This declaration is made solely for the purpose of establishing
    compliance with the requirements
    of Section 1.150-2 of the
    Treasury Regulations. This
    declaration does not bind the Issue to
    make any expenditure, incur any indebtedness, or proceed with
    the Projects.
    Section 3.
    The Issuer hereby declares itself its official intent to use
    proceeds
    of
    indebtedness
    to
    reimburse
    itself
    for
    Reimbursements Expenditures with respect to the Projects.
    Section 4.
    This declaration shall take effect from and after its adoption.
    Trustee Heidbreder moved, seconded by Trustee Bradford,
    that the resolution should be
    passed, approved, and adopted this 28th day of January
    2Cl14.
    On roll call Trustees
    McGinnis, Bradford, Axel, Heidbreder, and Tubandt voted
    aye. Voting nay, none.
    Resolution carried.
    RESOLUTION 14-05
    Declaration of official intent of the City of Muscatine, Iowa, acting by
    and through its Board of Water, Electric, and Communications Trustees
    of the City of Muscatine, Iowa, to reimburse certain expenditures
    from proceeds
    ofindebtedness for the Water Utility
    WHEREAS, the City of Muscatine, Iowa, (the "Issuer") acting by and through its
    Board
    of Water, Electric, and Communications Trustees (the "Board") intends to
    acquire land, construct, improve, furnish, and equip extensions, improvements, and
    other capital projects related to the MP&W Water Utility (collectively the
    "Projects"); and
    WHEREAS, the Issuer expects to pay certain expenditures (the "Reimbursement
    Expenditures")
    in connection with the Projects prior to the issuance of indebtedness
    for the purpose of financing costs associated with the Projects on a long-term basis;
    and
    WHEREAS, the Issuer reasonably expects that debt obligations in an amount not
    expected
    to exceed $11,000,000 will be issued with respect to financing of the
    Projects and
    that certain of the proceeds of such debt obligations will be used to
    reimburse the Reimbursement Expenditures; and
    WHEREAS, the Issuer desires to comply with the requirements of Treasury
    Regulation
    1.150-2 (the "Regulations") with respect to the Projects;

    Board Minutes
    January
    28, 2014
    Page 6
    of8
    NOW THEREFORE, it is hereby resolved by the Board of Water, Electric, and
    Communications Trustees of the City of Muscatine, Iowa, as follows:
    Section 1.
    The Issuer finds and determines that the foregoing recitals are
    true and correct.
    Section
    2.
    This declaration
    is
    made solely for the purpose of establishing
    compliance
    with the requirements of Section
    1.150-2
    of the
    Treasury
    Regulations. This declaration does not bind the Issue to
    make any expenditure, incur any indebtedness, or proceed with
    the Projects.
    Section
    3.
    The Issuer hereby declares itself its official intent to use
    proceeds
    of
    indebtedness
    to
    reimburse
    itself
    for
    Reimbursements Expenditures with respect to the Projects.
    Section
    4.
    This declaration shall take effect f-rom and after its adoption.
    Trustee
    Axel moved, seconded by Trustee McGinnis, that the resolution should be
    passed, approved, and adopted this
    28th
    day of January
    2014.
    On roll call Trustees
    McGinnis, Bradford,
    Axel, Heidbreder, and Tubandt voted aye. Voting nay, none.
    Resolution carried.
    RESOLUTION 14-06
    Declaration ofofficial intent of the City of Muscatine, Iowa, acting by
    and through its Board of Water, Electric, and Communications Trustees
    of the City of Muscatine, Iowa, to reimburse certain expenditures
    from proceeds
    ofindebtedness for the Communications Utility
    WHEREAS, the City of Muscatine, Iowa, (the
    "Issuer")
    acting by and through its
    Board
    of Water, Electric, and Communications Trustees (the
    "Board") intends
    to
    acquire
    land, construct, improve, furnish, and equip extensions, improvements, and
    other capital projects related to the MP&W Communications Utility (collectively the
    "Projects");
    and
    WHEREAS, the Issuer expects to pay certain expenditures (the "Reimbursement
    Expenditures") in connection with the
    Projects prior to the issuance of indebtedness
    for the purpose of financing costs associated with the Projects on a long-term basis;
    and
    WHEREAS, the Issuer reasonably expects that debt obligations in an amount not
    expected
    to exceed
    $5,000,000
    will be issued with respect to financing of the
    Projects and that certain of the proceeds of such debt obligations will be used to
    reimburse the Reimbursement Expenditures; and
    WHEREAS, the Issuer desires to comply with the requirements of Treasury
    Regulation
    1.150-2
    (the "Regulations") with respect to the Projects;

    Board Minutes
    January 28, 2014
    Page 7 of8
    NOW THEREFORE, it is hereby resolved by the Board of Water, Electric, and
    Communications Trustees
    of the City of Muscatine, Iowa, as follows:
    Section
    1.
    The Issuer finds and determines that the foregoing recitals are true
    and correct.
    Section
    2.
    This declaration is made solely for the purpose of establishing
    compliance
    with the requirements of Section
    1.150-2
    of the
    Treasury Regulations. This declaration does
    not bind the Issue to
    make any expenditure, incur any indebtedness, or proceed with the
    Projects.
    Section 3.
    The Issuer hereby declares itself its official intent to use proceeds
    of indebtedness to reimburse itself for Reimbursements
    Expenditures
    with respect to the Projects.
    Section 4.
    This declaration shall take effect from and after its adoption.
    Trustee Heidbreder moved, seconded by Trustee Bradford,
    that the resolution should be
    passed, approved, and adopted this
    28th
    day of January
    2014.
    On roll call Trustees
    McGinnis, Bradford, Axel, Heidbreder,
    and Tubandt voted aye. Voting nay, none.
    Resolution carried.
    The December Financial Operating Statements and Balance Sheets and the Quarterly
    Investment Report were presented as previously submitted to all Board members in written
    form. Mr. LoBianco stated that
    2013
    Year-End Financials would be covered in the Key
    Performance Indicators presentation. Trustee Axel moved, seconded by Trustee McGinnis, to
    receive and place on file the December Financial Operating Statements and Balance Sheets
    for the Water, Electric, and Communications Utilities, along with the Quarterly Investment
    Report. All Trustees voted aye. Motion carried.
    The Competitive Quotes for Public Improvements Report was presented as previously
    submitted
    to all Board members in written form. There were no items for approval.
    The Quarterly Project Status Report and Variance Analysis were presented as previously
    submitted
    to all Board members in written form. Trustee McGinnis moved, seconded by
    Trustee Bradford,
    to receive and place on file the Quarterly Project Status Report and
    Variance Analysis. All Trustees voted aye. Motion carried.
    The Critical Issues and Key Performance Indicators for the Water, Electric, and Communi-
    cations Utilities were previously submitted to
    all Board members in written format. Mr.
    LoBianco
    asked each critical issue leader to review the status of their critical issue and stated
    that Mr. Gowey would review the Key Performance Indicators sections. After review and
    discussion, Trustee McGinnis moved, seconded by Trustee Axel, to receive and place c_>n file
    the
    2013
    Year End Critical Issues and Key Performance Indicators for the Water, Electric, and
    Communications Utilities.
    Motion carried. All Trustees voted aye.
    The December departmental reports were presented as previously submitted to all Board
    members
    in written form. After discussion, Trustee Heidbreder moved, seconded by Trustee

    Board Minutes
    January 28,
    2014
    Page 8of8
    Axel, to receive and place on file the December departmental reports. All Trustees voted
    aye. Motion carried.
    The meeting was adjourned at 7:10 p.m.
    BOARD OF WATER, ELECTRIC, AND
    COMMUNICATIONS TRUSTEES OF THE CITY
    OF MUSCATINE, IOWA
    ca:t,
    Board Secretary